The energy crisis characterized by the oil products price rising and the imperatives of sustainable development do that renewable energies are an alternative today witch attract the interest of several research teams. Senegal, sub-Saharan country, not oil producer is not spared by this crisis. The consequence of this is a low coverage of the country (especially rural areas) by the national grid. For solving this, the new orientation of the energy policy focuses on the use of renewable energy particularly solar and wind.The main objective of this thesis is to identify a methodology of design of an isolated site of electrical energy production from alternative energies It is consists on, from site characteristics (energy resources, energy requirements):- to develop an approach that allows the choice of network architecture and sizing optimally all components of the network (machines, sources and storage devices) taking into account all the constraints- to design a device for controlling components and managing the energy flowsThis thesis contains three chapters:- Chapter 1 - poses the problem of energy in Senegal. The institutional organization of the electricity sub-sector and the ongoing projects are presented. Also, a study of micro- architectures networks is made.- Chapter 2 deals with tools and software. A comparative study of the main software of analysis, design and simulation of micro- network is realized. The components of our system have been modeled. Optimization methods and tools for graphical representation (Bond Graph, GIC and EMR) systems were presented. A survey and a literature review allowed us to evaluate the energy potential of the site and the needs of populations.- Chapter 3: This is the application of our tool on an isolated site identified in Senegal (MBoro / Mer). Optimization through the Annualized Cost of the System (ACS) objective function has allowed us to scale our system optimally. As the control system with Energetic Macroscopic Representation (EMR) has been designed.For further work should be considered a treatment of problems of availability of the system through monitoring and supervision of the system. The socio- economic component is also integrated in the future to meet the changing needs and habits of the population.