Maximum flow under proportional delay constraint

Given a network and a set of source destination pairs (connections), we con- sider the problem of maximizing the sum of the flow under proportional delay constraints. In this paper, the delay for crossing a link is proportional to the total flow crossing this link. If a connection supports non-zero flow, then the sum of the delay along any path corresponding to that connection must be lower than a given bound. The constraints of delay are on-off constraints because if a connection does not support non-zero flow, then there is no constraint for that connection. The difficulty of the problem comes from the choice of the connections supporting non-zero flow. We first prove a general approximation ratio using linear programming for a variant of the problem. We then prove a Polynomial Time Approximation Scheme when the graph of intersection of the paths has bounded treewidth. We finally prove that the problem is NP-hard even when the network is a tree.

Data and Resources

Additional Info

Field Value
Source https://hal.science/hal-00947049
Author Bonami, Pierre, Mazauric, Dorian, Vaxès, Yann
Maintainer CCSD
Last Updated May 6, 2026, 09:25 (UTC)
Created May 6, 2026, 09:25 (UTC)
Identifier hal-00947049
Language en
Rights https://about.hal.science/hal-authorisation-v1/
contributor ACRO ; Laboratoire d'informatique Fondamentale de Marseille (LIF) ; Aix Marseille Université (AMU)-École Centrale de Marseille (ECM)-Centre National de la Recherche Scientifique (CNRS)-Aix Marseille Université (AMU)-École Centrale de Marseille (ECM)-Centre National de la Recherche Scientifique (CNRS)-IBM ILOG CPLEX Madrid ; IBM-IBM
creator Bonami, Pierre
date 2014-05-06T00:00:00
harvest_object_id 38e5417a-afa2-4033-810f-1b5ca453682b
harvest_source_id 3374d638-d20b-4672-ba96-a23232d55657
harvest_source_title test moissonnage SELUNE
metadata_modified 2023-03-24T00:00:00
set_spec type:UNDEFINED