Advantages of a new ballastless trackform

This paper is based on a development over the past 5 years in France which culminates in early 2013 with the construction of a demonstration of this ballastless trackform on the French network north of Paris. In this paper, we summarise the history of this development, " New Ballastless Track " (NBT) through the conceptual design phases, the extensive laboratory testing, culminating in the construction of the demonstration track. Construction will be completed in June 2013 and train operations are scheduled to start later in 2013. We complete our paper with our conclusions concerning the difference in life cycle costs between NBT and ballasted track. To that end, we confirm the conclusions of many previous studies over the past few years, while throwing some light on the parameters which will tend to accentuate the advantage of NBT.

Data and Resources

Additional Info

Field Value
Source 2th International Railway Engineering Conference and Exhibition
Author Masson, C, Robertson, I, Sedran, Thierry, Barresi, François, Caillau, Joel, Keseljevic, Christophe, Vanzenberg, Jm
Maintainer CCSD
Last Updated May 7, 2026, 18:21 (UTC)
Created May 7, 2026, 18:21 (UTC)
Identifier hal-00920373
Language en
contributor Alstom Transport (Alstom Transport)
coverage Johannesburg, South Africa
creator Masson, C
date 2011-04-06T00:00:00
harvest_object_id dae9e84f-ce5c-4b33-8fed-295220966fc8
harvest_source_id 3374d638-d20b-4672-ba96-a23232d55657
harvest_source_title test moissonnage SELUNE
metadata_modified 2024-12-03T00:00:00
set_spec type:COMM