Erratum to ''Johnson's algorithm : A key to solve optimally or approximately flowshop scheduling problems with unavailability periods'' [International Journal of Production Economics 121 (2009) 81-87]

International audience

Data and Resources

Additional Info

Field Value
Source ISSN: 0925-5273
Author Rapine, Christophe
Maintainer CCSD
Last Updated May 18, 2026, 23:07 (UTC)
Created May 18, 2026, 23:07 (UTC)
Identifier hal-00697092
Language en
Rights https://about.hal.science/hal-authorisation-v1/
contributor Laboratoire de Génie Industriel, de Production et de Maintenance (LGIPM) ; Université de Lorraine (UL)
creator Rapine, Christophe
date 2013-08-01T00:00:00
harvest_object_id 3707fa44-8b7f-4ab7-b93e-74968befdc69
harvest_source_id 3374d638-d20b-4672-ba96-a23232d55657
harvest_source_title test moissonnage SELUNE
metadata_modified 2025-11-04T00:00:00
relation info:eu-repo/semantics/altIdentifier/doi/10.1016/j.ijpe.2012.11.010
set_spec type:ART