-
Study of the use of tunnel excavated materials from Lyon-Turin railway link a...
The excavated materials of the future tunnel between Lyon and Turin present sulphate content higher than those recommended by current European standards. These... -
Preliminary tests on high sulphate content aggregates for tunnel lining concrete
The 57 km length basis tunnel between St-Jean-de-Maurienne (France) and Susa (Italy) is a part of the future new railway Lyon-Turin. The works will generate about 43...
